Why is land the hardest property to finance?
Every other commercial loan is repaid from rent or business income. Land produces neither. A land loan is repaid only when something else happens: a construction loan pays it off, the land is sold, or the borrower pays from other money. Lenders call that exit risk, the chance that the event meant to repay the loan does not occur.
Land values also swing more than building values, and in a downturn land is the slowest property to sell. Lenders respond in predictable ways:
- They lend a smaller share of value than on income property.
- They keep terms short, commonly one to three years.
- They require a personal guaranty, meaning you repay from other assets if the land does not.
- They want proof that you can make interest payments from other income or cash.
- They ask for a specific plan and timeline, not a general intention to build someday.
The practical result is that land takes more cash than new developers expect. Plan the cash before you sign a contract.
Raw, entitled or improved: what stage is the land in?
Lenders price land by how much uncertainty has been removed. Entitlements are the government approvals needed to build what you plan: zoning, site plan approval, and permits. Each stage cleared raises both the value and the share a lender will finance.
| Stage | What it means | Commonly financed at |
|---|---|---|
| Raw land | No approvals and no utilities to the site | Up to about 50% of value, often less, and many lenders decline |
| Entitled land | Zoning and site plan approved for the intended use | About 50% to 60% of value |
| Improved (finished) land | Roads, grading and utilities in place, ready for a building permit | About 60% to 65% of value, sometimes more |
| Land with a signed tenant or pre-sale | A committed user and a construction start in sight | Usually rolled into the construction loan |
These are common ranges, not rules. Bank regulators set outer guidelines for banks that are higher than what most banks actually offer, and each bank sets its own policy below them. A parcel in the path of growth with utilities at the street gets better terms than remote acreage with the same appraised value.
Who makes land loans?
| Source | Best for | Typical terms |
|---|---|---|
| Local and regional banks | Entitled or improved land with a near-term construction start, existing customers | 1 to 3 years, interest-only, full recourse, often with a deposit relationship |
| The seller | Raw land, long entitlement periods, buyers preserving cash | Negotiated: a down payment, interest-only payments and a balloon |
| Private and hard money lenders | Fast closings, land banks will not touch, borrowers mid-entitlement | 6 to 24 months, higher rates and fees, lower loan-to-value |
| SBA 504 or 7(a) | A business buying land to build its own building | Land is financed as part of the construction project, not held on its own |
| Equity partners | Large or early-stage sites where debt is not available | No payments, but a share of the profit |
Banks make most land loans, and they make them mainly to people they know. A bank that holds your deposits and has seen you complete a project is far more likely to finance the next site. That is the case for starting locally, explained in local bank vs national lender.
Seller financing is more common in land than anywhere else in commercial real estate, because many land sellers own the property free of debt and have few cash buyers. Another approach is an option or a long closing period: you pay the seller a deposit, work on approvals during the contract, and close only when the entitlements are in hand. That shifts the entitlement risk off your loan. Private money is covered in hard money loans for commercial property.
A worked example: the real cash needed to carry land
Say you find an entitled site for $1,000,000 and plan a small commercial building. The figures are hypothetical and round.
- Land loan. A bank lends 50%, or $500,000. You put in $500,000.
- Interest. The loan is interest-only at a hypothetical 9%. Interest is $500,000 times 9%, or $45,000 a year.
- Taxes and insurance. Property taxes and liability insurance on the site are $15,000 a year.
- Carrying cost. $45,000 plus $15,000 is $60,000 a year. Design and permitting take two years, so the carry is $120,000.
- Soft costs. Architecture, engineering, legal and permit fees before construction come to $150,000.
- Total cash before construction. $500,000 plus $120,000 plus $150,000 is $770,000.
The purchase needed $500,000 of cash, but getting to the construction start needed $770,000. Every extra year of delay adds another $60,000.
Now the construction loan. The total project cost is $5,000,000, including the land at $1,000,000. A construction lender offers 70% of cost, a loan of $3,500,000, so the project needs $1,500,000 of equity. The construction loan pays off the $500,000 land loan as its first draw. You get credit for the $500,000 you paid toward the land and, with most lenders, for the $150,000 of documented soft costs. Remaining cash to bring is $1,500,000 minus $500,000 minus $150,000, or $850,000. Interest and taxes paid while holding the land usually earn no equity credit.
If the land has risen in value since you bought it, some lenders give equity credit at the appraised value and others only at your cost. Ask before you count on it. Loan-to-cost is explained in LTV vs LTC.
What do land lenders want to see?
A land lender is underwriting you and your plan, since the property has no income to study. Bring:
- The plan. What you will build, for whom, at what cost and on what schedule.
- Entitlement status. Current zoning, approvals received, approvals pending and the realistic time to finish them.
- Site reports. A survey, title commitment, Phase I environmental site assessment, and where relevant soil tests, wetlands and flood zone determinations.
- Utilities and access. Written confirmation that water, sewer, power and road access are available and what it costs to connect.
- Your track record. Completed projects of similar type and size, or an experienced partner or contractor.
- Financial strength. A personal financial statement, tax returns and liquid cash well above the interest you will owe.
- The exit. A construction lender's interest, a tenant's letter of intent, or a buyer.
The environmental and other studies are described in appraisals, environmental reports and other third-party reports. Order the Phase I and check utilities during your contract period, before your deposit becomes non-refundable.
Moving from the land loan to the construction loan
The cleanest exit is a construction loan from the same bank that holds the land loan. If that is the plan, say so at the start and ask what the bank will need to approve construction: plans, a fixed-price contract, pre-leasing or pre-sales, and your equity.
- Close on the land with enough term to finish approvals, plus a cushion.
- Complete entitlements, design and contractor pricing.
- Secure tenants, buyers or your own business's commitment to occupy.
- Apply for the construction loan at least three to four months before the land loan matures.
- Close the construction loan, which pays off the land loan and funds the build in draws.
If the land loan comes due before you are ready, you will need an extension, a refinance with a private lender or more cash to pay it down. Negotiate extension options into the land loan on day one. The next stage is covered in commercial construction loans explained and how to find a construction lender. An owner building for its own business should read how to buy your business building with an SBA loan.
Common mistakes with land financing
- Budgeting only the down payment and forgetting interest, taxes and design costs during the hold.
- Assuming approvals will arrive on the schedule the seller or a consultant suggested.
- Taking a 12-month loan for an 18-month entitlement process.
- Buying before confirming sewer capacity, road access or flood status.
- Counting on appraised-value equity credit without asking the construction lender.
- Closing with a land lender that has no interest in making the construction loan, with no other takeout lined up.
Land loans carry personal liability and terms differ from lender to lender, so confirm everything with the lender and your own counsel before you sign.
Where CREaiD helps
CREaiD's lender search is built on public loan records from banks, credit unions, SBA lenders, private lenders and funds. Pick the state, the kind of loan and the loan amount, and you see lenders that made that kind of loan there, which gives you a short list of local names to call about the land and the construction loan that follows.
Key takeaways
- Land earns no income, so lenders finance a smaller share of value, keep terms short and require a personal guaranty.
- Each stage cleared (entitlements, utilities, site work) raises both the land's value and the share a lender will finance.
- Local banks, sellers and private lenders make most land loans, and seller financing is unusually common.
- Budget for interest, taxes and design costs during the hold, not just the down payment.
- Line up the construction loan before the land loan matures, ideally with the same bank.
Questions people ask
How much down payment do I need for commercial land?
Commonly 35% to 50% of the price, and sometimes more for raw land with no approvals. Entitled land with utilities in place needs less. Lenders also want to see cash to cover interest and taxes during the hold.
Can I get a loan on raw land with no zoning approvals?
It is difficult. Many banks decline raw land or lend only to strong existing customers at low loan-to-value. Seller financing, a private lender or a long contract period that lets you gain approvals before closing are the usual routes.
Can I use an SBA loan to buy land?
Only as part of a project where your business will build and occupy the building. SBA 504 and 7(a) loans can include the land in a construction project. They are not meant for holding land as an investment.
Does the land count as equity for a construction loan?
Yes. Cash you paid toward the land, and land you own free of debt, normally count toward the equity a construction lender requires. Whether you get credit at your cost or at a higher appraised value depends on the lender.
How long are commercial land loans?
Commonly one to three years, usually interest-only with the balance due at maturity. The term should cover the time needed for approvals and design, plus a cushion. Ask for extension options when you negotiate the loan.
Is seller financing a good way to buy development land?
It can be, since it often comes with a lower down payment and flexible terms. Check that the seller's note allows prepayment and will be released or subordinated when your construction loan closes. Have an attorney draft or review the note and deed of trust.