Preview of the new creaid.ai. Not live yet. Yellow = to confirm with you.

Underwriting and numbers · 9 min read

How Long Does It Take to Close a Commercial Real Estate Loan?

Short answer

Most commercial real estate loans take 45 to 90 days to close, counted from a signed term sheet to funding. Bank and agency loans commonly fall in that range, SBA loans often take 60 to 90 days, HUD loans take many months, and private bridge or hard money loans can close in one to four weeks. The appraisal and other third-party reports usually set the pace, so the fastest closings are the ones where the borrower sends a complete package on day one.

A commercial bank building
A commercial bank building. Example photo: Joe Mabel, CC BY-SA 3.0, via Wikimedia Commons.

How long does each type of lender take?

Timing depends first on who is lending. The ranges below are typical for a straightforward loan and run from a signed term sheet (the lender's written summary of proposed terms) to funding.

Lender typeTypical time to closeWhat drives it
Bank or credit unionAbout 45 to 75 daysAppraisal, loan committee schedule, attorney documents
Agency apartment loan (Fannie Mae, Freddie Mac)About 45 to 75 daysThird-party reports and a standard, well-defined process
CMBS or life insurance companyAbout 60 to 90 daysDetailed legal review, lease review, tenant confirmations
SBA 7(a) or 504About 60 to 90 days, sometimes longer for 504Business underwriting plus SBA approval steps
HUD multifamilyCommonly 6 to 12 months or moreAgency review and a long application process
Bridge lender or debt fundAbout 2 to 6 weeksFewer approval layers, often quicker reports
Private or hard money lenderAbout 1 to 3 weeksValue-based decision, limited documents

Speed has a price. The lenders that close fastest usually charge the most, which is why a short-term loan is often used to buy and a slower, cheaper loan replaces it later. See commercial bridge loans explained.

What are the stages of a commercial loan closing?

  1. Loan request and quotes (about 1 to 2 weeks). You send the package, lenders review it and reply with quotes or term sheets.
  2. Term sheet and deposit (a few days). You sign one term sheet and pay a deposit that covers the reports and sometimes legal costs. The clock starts here.
  3. Third-party reports (about 2 to 4 weeks). The lender orders the appraisal, the environmental report and often a property condition report. They run at the same time. See appraisals, environmental reports and other third-party reports.
  4. Underwriting (about 2 to 4 weeks, overlapping with the reports). The lender verifies income and expenses, reads the leases, reviews your finances and writes a credit memo.
  5. Approval and commitment (about 1 to 2 weeks). The loan committee approves, and the lender issues a commitment letter with final terms and conditions.
  6. Legal documents, title and survey (about 2 to 3 weeks). Attorneys draft and negotiate loan documents. The title company clears title issues, and the survey is updated if needed.
  7. Closing and funding (1 to 3 days). You sign, the lender wires funds to the title company, and the deed and mortgage are recorded.

Several stages overlap, which is how a list that adds up to more than three months on paper fits inside 60 days in practice.

What slows a commercial loan down?

Lenders rarely miss a closing date because they are slow at their own work. The delays come from missing information and from findings nobody expected.

  • An incomplete package. Missing tax returns, an old rent roll or statements that do not match each other. Every request for more documents costs days.
  • The appraisal. Good commercial appraisers are booked ahead, and an unusual property takes longer. A value below the price forces a renegotiation.
  • Environmental findings. If the first report finds a possible problem, such as a former gas station or dry cleaner nearby, the lender may require testing that adds weeks.
  • Title and survey problems. Old liens, easements, boundary issues or an unclear legal description.
  • Tenant paperwork. Many lenders require estoppel certificates, which are signed statements from tenants confirming their lease terms. Tenants are not in a hurry.
  • Entity and ownership documents. Missing operating agreements, or a change of partners in the middle of the loan.
  • Insurance. The lender's insurance requirements must be met before funding, and quotes can take time.
  • Changing the deal. A new loan amount, a new guarantor or a new price sends the file back to underwriting.

A worked example: planning a purchase backward from the closing date

Say you sign a contract to buy a property. The contract gives you 75 days to close and a financing contingency that expires on day 45. A financing contingency lets you cancel and keep your deposit if you cannot get a loan by that date.

The slow version. You start looking for lenders after signing. Quotes arrive by day 12, and you sign a term sheet on day 15. Reports are ordered on day 16. The appraisal takes four weeks and arrives on day 44 (16 plus 28). The commitment comes about ten days later, on day 54. Your contingency expired on day 45, nine days before you had a commitment. From day 45 to day 54 your deposit is at risk with no approved loan.

The prepared version. You screen lenders before you sign the contract and send a complete package on day 1. You sign a term sheet on day 5, and reports are ordered on day 6. The appraisal arrives on day 34 (6 plus 28). The commitment follows on day 44, one day inside the contingency. Loan documents and title work take three more weeks, so you are ready to close on day 65 (44 plus 21), with ten days of cushion before day 75.

The only difference between the two versions is ten days at the start. Those ten days decide whether you hold a commitment before your deposit becomes non-refundable. If the dates cannot work even in the prepared version, ask the seller for a longer contingency before you sign, not after. An extension requested on day 40 usually costs money, and one requested during negotiation usually costs nothing.

How to close faster

You cannot make an appraiser work faster, but you control most of the rest. These steps commonly save one to three weeks.

  • Prepare the package before you need it. Rent roll, trailing twelve months, prior-year statements, leases, personal financial statement, tax returns, schedule of real estate owned and entity documents. The list is in what lenders want to see in a commercial loan request package.
  • Choose lenders that make this exact loan. A lender outside its usual property type or area takes longer and is more likely to drop out.
  • Ask about timing before you sign. How often does the loan committee meet? Who orders the appraisal, and how long are appraisers taking in this market?
  • Pay the deposit the day you sign. Reports are not ordered until the deposit arrives.
  • Answer every request within a day. Name one person on your side who owns the checklist.
  • Start title, survey and insurance early. Do not wait for the commitment.
  • Hire an attorney who closes commercial loans regularly. Loan document negotiation is a common place to lose a week.
  • Warn tenants that estoppel requests are coming and follow up in person.

How to match the loan to your deadline

If the seller wants a 30-day closing, a bank loan is unlikely to make it. You have three practical choices: negotiate more time, close with a bridge or private loan and refinance later, or close with cash and finance afterward. Buyers on a 1031 exchange clock face the same problem with fixed tax deadlines, covered in financing a 1031 exchange purchase.

When you write the purchase contract, set the financing contingency and the closing date around the lender's real timeline, not the other way around. Ask two or three lenders how long they need before you agree to dates. If you plan to refinance out of a short-term loan later, read how to exit a bridge loan first.

Where CREaiD helps you save time

The first weeks are usually lost on lenders that do not make the loan. CREaiD's lender search is built on public loan records: you pick the state, the kind of loan and the loan amount and see the lenders that made that kind of loan there. The deal check produces a one-page loan request from your numbers, so the first email to a lender already has what it needs to respond. It has a free version.

Closing times depend on the lender, the property and the reports, so confirm the expected schedule with the lender in writing and have your own counsel review contract deadlines before you sign.

Brian Gramlich
About the author

Brian Gramlich is the CEO and founder of Terrydale Capital, a commercial real estate finance firm based in Dallas, Texas, and the founder of CREaiD.

Key takeaways

  • Most commercial real estate loans close in 45 to 90 days from a signed term sheet.
  • Private and bridge lenders can close in one to six weeks, and HUD loans commonly take six to twelve months or more.
  • The appraisal and other third-party reports usually take two to four weeks and set the pace.
  • A complete package on day one and a deposit paid at signing are the cheapest ways to save time.
  • Set contract deadlines around the lender's real timeline, and get a commitment before your financing contingency expires.

Questions people ask

Can a commercial real estate loan close in 30 days?

A bank or agency loan rarely closes in 30 days, because the appraisal alone commonly takes two to four weeks. Private, hard money and some bridge lenders can close in 30 days or less. A bank you already borrow from can sometimes move faster on a simple deal, so ask.

What takes the longest in a commercial loan closing?

Usually the third-party reports, especially the appraisal, followed by legal documents and title work. Borrower delays are the other big cause: slow answers to document requests can add more time than any report. Tenant estoppel certificates are a common late surprise.

How long does commercial loan underwriting take?

Underwriting itself commonly takes two to four weeks and runs alongside the reports. It ends when the appraisal is in and the loan committee approves. A clean, complete file moves through much faster than one with open questions.

How long does an SBA loan take to close on a commercial property?

Plan on about 60 to 90 days, and sometimes longer for a 504 loan, which has two lenders and an extra approval step. Lenders with delegated SBA authority can approve faster. The business documents take as much time as the real estate documents.

Is a term sheet the same as a loan approval?

No. A term sheet is a proposal that is usually not binding on the lender. Approval comes later, as a commitment letter, after the reports and underwriting are done. Do not waive a financing contingency based on a term sheet alone.

When should you start the loan process on a purchase?

Before you sign the contract, if you can. Screen lenders and prepare the package while you negotiate the price, so you can sign a term sheet within the first week. Every day saved at the start is a day of cushion before your contingency expires.

Find lenders for your deal in minutes

CREaiD shows the lenders that really made your kind of loan in your state, from public loan records.

Start free